FIELD: mining.
SUBSTANCE: furnace has an assembly of loading of welding and production camera, electric heating elements, gas burners and a feeder. The feeder and heating elements are made of heat-resistant high-chromium steel. The heating elements numbering at least 10 pieces are located symmetrically on the ascending curve along a horizontal axis of the furnace at a distance 300-350 mm from each other. Gas burners of the minimum power are installed in furnaces at an angle to a melting mirror.
EFFECT: obtaining of homogeneous basalt melt with low carbon content allowing to obtain basalt fibre with high degree of plasticity.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTION OF CONTINUOUS FIBERS FROM ROCK AND FURNACE FOR PRODUCTION OF CONTINUOUS FIBERS FROM ROCK | 2002 |
|
RU2203232C1 |
METHOD AND APPARATUS FOR POOL-FREE MELTING OF ROCK | 2002 |
|
RU2230709C2 |
METHOD AND DEVICE FOR PRODUCING CONTINUOUS FIBRE FROM BASALT ROCKS | 2023 |
|
RU2805442C1 |
METHOD AND DEVICE FOR PRODUCTION OF CONTINUOUS MINERAL FIBER | 2018 |
|
RU2689944C1 |
METHOD OF PRODUCING CONTINUOUS FIBRES FROM BASALT ROCKS AND DEVICE TO THIS END | 2009 |
|
RU2421408C1 |
METHOD OF MANUFACTURING CONTINUOUS ALUMINOSILICATE FILAMENT | 2001 |
|
RU2180892C1 |
METHOD FOR PRODUCING FIBRES FROM MINE ROCK, AND "KIBOL-GRANULA MODULE" PLANT FOR ITS IMPLEMENTATION | 2008 |
|
RU2452696C2 |
ELECTRODE ASSEMBLY FOR GAS-ARC FURNACE | 2015 |
|
RU2586108C1 |
METHOD OF PRODUCTION OF THE IMPROVED QUALITY CONTINUOUS MINERAL FIBERS | 2005 |
|
RU2303005C2 |
BASALTIC FILAMENT PRODUCING METHOD | 1992 |
|
RU2039715C1 |
Authors
Dates
2015-04-10—Published
2014-01-28—Filed