FIELD: construction.
SUBSTANCE: method of construction of pile-slab foundation includes excavation of pits and piling field with subsequent concreting of foundation slab. Piling field is constructed over the entire area of the pit made of bored piles of the same length, while the piles of the central zone of the piling field are constructed under protection of the polymer solution, and piles of peripheral area are constructed under protection of the retaining bentonite slurry.
EFFECT: provision of load transfer between the piles, increase of the resistance over the lateral surface of piles, reduction of materials consumption and labour intensity.
1 ex
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549633C1 |
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549632C1 |
SINGLE-PILE-SLABBY FOUNDATION | 2016 |
|
RU2638664C2 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION | 2016 |
|
RU2616633C1 |
METHOD OF ERECTING HIGH-RISE BUILDING ON NATURAL BASE | 2016 |
|
RU2634762C1 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
Authors
Dates
2015-04-27—Published
2013-12-26—Filed