FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in construction of heavy buildings on pile-raft foundations in seismic regions located on sections with non-uniformly compressible base and, consequently, risk of development of inadmissible rolls of foundations and elevated structures. Method of regulating rolls of pile-slab foundation in seismic regions on non-uniformly compressible grounds includes arrangement of pile field and foundation plate with through holes with possibility of cavities formation and filling with concrete. In the cavities formed between the foundation plate and piles, jacks are pre-installed, access to which is provided via through holes in the foundation plate, wherein one of them supplies liquid for operation of jack, and through another one - fine-grained high-strength expanding concrete fixing adjusted position of pile-raft foundation.
EFFECT: technical result consists in improvement of efficiency of pile-raft foundation by introducing possibility of regulating possible rolls.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
SLAB FOUNDATION ON NON-UNIFORM COMPRESSIBLE BASE WITH POSSIBILITY OF ADJUSTING OF HEELING | 2020 |
|
RU2731969C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD TO ERECT PILED RAFTS | 2013 |
|
RU2548461C1 |
METHOD FOR PILE-AND-SLAB FOUNDATION CONSTRUCTION IN SEISMIC AREAS | 2005 |
|
RU2300604C1 |
METHOD TO ERECT PILED RAFTS IN SEISMIC AREAS | 2012 |
|
RU2513050C1 |
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549632C1 |
METHOD FOR SLAB-AND-PILE FOUNDATION ERECTION | 2006 |
|
RU2305154C1 |
Authors
Dates
2020-10-23—Published
2020-03-19—Filed