FIELD: machine building.
SUBSTANCE: installation contains multiple processing sections 2000, and multiple moving devices 3000. The processing sections 2000 includes welding processing section 100 for welding and accompanying processes such as testing, laying, preparation for welding. The processing sections 2000 also contain section 200 for rotor and its parts machining, for example, turning, milling and drilling. The moving devices 3000 include palette assembly 500, and rotating assembly 600 located in the welding processing section 100 to move, to rotate, and to transport the rotor along it. The moving devices 3000 additionally include a transportation and laying station 700 to transport the rotor along the processing sections 2000. The devices 3000 contain a shuttle mechanism 710 for the processed rotor and its parts, and servodrive 720.
EFFECT: simplified process of rotors production, and reduced labour intensity.
15 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS TURBINE ENGINE ROTOR SECTIONS MANUFACTURING METHOD | 2018 |
|
RU2682065C1 |
AUTOMATIC FLOW LINE FOR ASSEMBLING AND WELDING MOTOR VEHICLE BODIES | 0 |
|
SU1609440A3 |
METHOD OF WORKING BLANKS, NAMELY FLAT SURFACES OF BRAKE DISC OF TRANSPORT VEHICLES AND WORKING CENTER FOR PERFORMING THE SAME | 2003 |
|
RU2306215C2 |
SYSTEMS AND METHODS USED IN WELDING OF PIPE SEGMENTS IN PIPELINE | 2015 |
|
RU2708721C2 |
METHOD OF PIPE LAYING FROM SHIP (VERSIONS), METHODS FOR STORAGE AND PREASSEMBLY OF PIPE SECTIONS ON PIPE-LAYING SHIP (VERSIONS) AND PIPE-LAYING SHIP (VERSIONS) | 2008 |
|
RU2478862C2 |
SYSTEMS AND METHODS USED IN WELDING PIPE SEGMENTS IN PIPELINE | 2019 |
|
RU2775615C2 |
ELECTRODE PLATE WRAPPER | 2011 |
|
RU2535154C1 |
WELDING METHOD AND SYSTEM | 2015 |
|
RU2695694C2 |
PULSE HEAT SEALING OF CONTINUOUSLY MOVING FILM MATERIAL | 2020 |
|
RU2811932C2 |
IMPROVED SYSTEM FOR PROCESSING, STORAGE AND TRANSPORTATION OF NATURAL GAS | 1998 |
|
RU2205246C2 |
Authors
Dates
2015-08-20—Published
2013-12-13—Filed