FIELD: process engineering.
SUBSTANCE: invention relates to fibres of basalt stock and can be used for production of whatever materials for motor car production. Proposed process comprises loading of basalt rock into furnace, fusing and melt feeing into glass feeders. Hydraulic lock located ahead of flow channel is used to create three zones of fused basalt in tank furnace pool: stationary lower zone of crystallized basalt, mid low-mobility zone containing minor amount of crystalline inclusions and working low of basalt melt without inclusions. Structure composed of two-three heated slotted stones is arranged between top and bottom slotted stone and glass feeder. Equipment for production of basalt fibres comprises adapter nozzles with one or several slots.
EFFECT: higher quality of basalt melt, stabilized feed of basalt melt.
2 cl, 10 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
ELECTRICAL CERAMIC FURNACE WITH INDIRECT HEATING FOR FORMING OF CONTINUOUS AND STAPLE GLASS FIBRES | 2014 |
|
RU2560761C1 |
METHOD AND DEVICE FOR PRODUCING CONTINUOUS FIBRE FROM BASALT ROCKS | 2023 |
|
RU2805442C1 |
MULTI-FILM SLEEVED FEEDER FOR FORMING FIBER FROM MELT ROCKS | 2016 |
|
RU2618256C1 |
METHOD AND DEVICE FOR FORMING BASALT FIBERS | 2001 |
|
RU2193538C1 |
DEVICE WITH FEEDER FURNACE TO PRODUCE CONTINUOUS BASALT FIBERS | 2009 |
|
RU2412120C1 |
SPINNERET FEEDER FOR PRODUCTION OF CONTINUOUS FIBER FROM ROCK MELT | 2000 |
|
RU2167835C1 |
MULTIDRAWING NOZZLE FEEDERS FOR PRODUCTION OF MINERAL FIBERS OUT OF MELT OF ROCK | 2002 |
|
RU2217393C1 |
MULTIPLE-DIE FEEDER FOR MANUFACTURING CONTINUOUS FIBERS FROM MINERAL MELT | 1993 |
|
RU2087435C1 |
PROCESS OF MANUFACTURE OF FIBERS FROM ROCKS AND GEAR FOR ITS IMPLEMENTATION | 1997 |
|
RU2136617C1 |
METHOD FOR MANUFACTURING FILAMENTS FROM MELT OF ROCKS AND DEVICE | 1993 |
|
RU2068814C1 |
Authors
Dates
2015-08-20—Published
2013-10-15—Filed