FIELD: process engineering.
SUBSTANCE: invention relates to cold pressure welding of parts from high-strength materials. First, contact surfaces of parts are cleaned to place elastic spacer there between. Note here that used metal spacer with mechanical properties at maximum plastic deformation lower than those of welding parts. Said spacer is pre-perforated to fill made bores with diluted nitric acid. Welding is performed in three steps. Initially, spacer is deformed unless a complete closing of made bores with squeezing of diluted nitric acid residues therefrom. Then, pressure is applied for the period of chemical interaction of said acid with oxide plies of bonding metals. Final deformation is performed to formation of metal bonds on contact surfaces. Spacer depth is selected so that total deformation degree is not smaller than 60% and not over 90%, deformation degree at first step before closing of bores does not exceed 20% while at second step it does not smaller than 50%.
EFFECT: higher efficiency of bonding without preheating.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MANUFACTURING A COMPOSITE WORKPIECE OF "DISC-SHAFT" TYPE FROM HEAT-RESISTANT ALLOYS | 2019 |
|
RU2706925C1 |
METHOD FOR DIFFUSION WELDING OF CERAMIC WORKPIECES | 2020 |
|
RU2752820C1 |
METHOD FOR OBTAINING SEMI-FINISHED PRODUCTS FROM METALS AND ALLOYS BY PSEUDOPOWDER METALLURGY PROCESS | 2001 |
|
RU2208063C2 |
METHOD FOR PRODUCING METAL PANELS FROM TITANIUM-ALUMINIUM ALLOYS | 2015 |
|
RU2598747C1 |
PRESSURE-WELDING METHOD | 1991 |
|
RU2010689C1 |
METHOD OF MANUFACTURE OF ELASTIC METALL SEALING GASKETS | 2017 |
|
RU2641202C1 |
METHOD AND DEVICE FOR PRODUCTION OF LARGE-SIZED RIBBED PANELS | 2012 |
|
RU2523158C2 |
METHOD OF PRESSURE WELDING OF WORKPIECES FROM TITANIUM ALLOY | 2009 |
|
RU2415738C1 |
MULTILAYER CELLULAR STRUCTURE AND METHOD OF ITS PRODUCTION | 2009 |
|
RU2440205C2 |
METHOD OF PRESSURE WELDING | 0 |
|
SU1754365A1 |
Authors
Dates
2015-10-20—Published
2014-03-24—Filed