FIELD: construction.
SUBSTANCE: invention relates to construction, particularly to construction of supports of bridges, structures of pile type with larger diameter. Method of constructing foundation support using sunk well and development machine, which includes planning area for construction of well, making well section, forming a shell well, immersing shell well. Well section is used in form of rings. At planned area is set a first ring and is suspended tunnelling machine with working member down. Tunnelling machine starts working soil inside first ring, in formed cavity is lowered first ring. To upper end of first ring is secured bottom end of second ring, each time. When next ring is immersed, following ring is attached to it. During whole process of tunnelling generated soil in form of pulp is pumped to surface by means of pump and hoses. After achieving required depth of penetration is stopped, finished shell of foundation support is sealed and residual water is pumped therefrom. Further, injection of cement grout into gap between finished shell and soil is carried out.
EFFECT: technical result consists in provision of manufacturability, creating a durable foundation support, reduction of material consumption.
16 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BUILDING UNDERGROUND CONSTRUCTION UNDER COMPLICATED ENGINEERING AND GEOLOGICAL CONDITIONS | 1995 |
|
RU2099473C1 |
UNDERGROUND SUSPENDED TUNNEL FOR CONSTRUCTION IN HARD ENGINEERING AND GEOLOGICAL CONDITIONS | 1996 |
|
RU2096558C1 |
METHOD FOR CONSTRUCTION OF ESCALATOR CASCADE COMPLEX FOR THE ENTRANCE TO THE METRO STATION, CONSTRUCTED USING CUT-AND-COVER METHOD | 2021 |
|
RU2766876C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
METHOD OF ERECTION OF VERTICAL CYLINDRICAL WELLS AND EXTRACTION COMBINE FOR METHOD IMPLEMENTATION | 2014 |
|
RU2561124C1 |
METHOD FOR UNDERGROUND TRENCHLESS INSTALLATION OF PIPELINES | 2012 |
|
RU2526474C2 |
METHOD FOR CONSTRUCTION OF FOUNDATION PIT | 2001 |
|
RU2190725C1 |
COMPLEX FOR CONSTRUCTION OF VERTICAL SHAFTS | 2014 |
|
RU2556764C1 |
APPARATUS FOR MAKING MINE SHAFTS | 0 |
|
SU1752964A1 |
Authors
Dates
2016-11-10—Published
2015-09-03—Filed