DEVICE FOR SPACING OF SLEEPERS ACCORDING TO SLEEPER DENSITY DURING ASSEMBLY OF TRACK LINKS Russian patent published in 2017 - IPC E01B29/10 

Abstract RU 2612313 C1

FIELD: construction.

SUBSTANCE: device for spacing of sleepers along plot during assembly of railway track links contains a portal trolley moving along the rail track enclosing the assembling bench path. The trolley is equipped with grippers for rails of the path enclosing the bench and with the sleeper position sensors. A movable carriage is mounted on a trolley to move on it along guides. The carriage is equipped with a sleeper density step setter. Regulated stops to interact with lateral edges of concrete sleepers are mounted on the carriage and made vertically rotating to move them along shallow arc when placed between the side faces of the adjacent sleepers. The carriage movement is performed after reset of all the previous commands by the command of the sleeper position sensor for the sleeper link mounted according to sleeper spacing.

EFFECT: increased productivity and improved performance of the device.

2 dwg

Similar patents RU2612313C1

Title Year Author Number
MOBILE DEVICE FOR REINFORCED CONCRETE PALES INSTALLATION BASED ON EPURE AND "CORD" 2008
  • Margolin Aleksandr Iosifovich
  • Vasil'Ev Valerij Evgen'Evich
  • Skripachev Ivan Fedorovich
  • Bogomolova Raisa Trofimovna
RU2376411C1
EQUIPMENT FOR LAYING TIES ALONG CURVE ON RAIL-LENGTH ASSEMBLY LINE 0
  • Tonkonogov Boris Grigorevich
  • Ilinskij Valerij Igorevich
  • Margolin Aleksandr Iosifovich
  • Skripachev Ivan Fedorovich
SU1789581A1
LINE FOR ASSEMBLY OF RAIL LENGHTS ON WOODEN SLEEPERS 2007
  • Margolin Aleksandr Iosifovich
  • Knysh Vitalij Dmitrievich
  • Skripachev Ivan Fedorovich
  • Bunin Aleksej Ivanovich
RU2357036C1
MOBILE DEVICE FOR SINGLE REPLACEMENT OF TIES ON STAND IN REPAIR OF RAIL LENGTHS 2008
  • Margolin Aleksandr Iosifovich
  • Knysh Vitalij Dmitrievich
  • Skripachev Ivan Fedorovich
  • Bogomolova Raisa Trofimovna
RU2377355C1
MOBILE UNIT FOR REINFORCED CONCRETE BEAMS INSTALLATION IN POINT OPERATING GEAR AGAINST DIAGRAM AND ORDINATES 2007
  • Margolin Aleksandr Iosifovich
  • Knysh Vitalij Dmitrievich
  • Skripachev Ivan Fedorovich
  • Fedoseev Dmitrij Alekseevich
RU2355843C1
AUTOMATED COMPLEX FOR ASSEMBLING RAIL-SLEEPER GRID OF RAILWAY TRACK 2021
  • Klementov Aleksej Sergeevich
  • Zmeev Konstantin Vladimirovich
  • Saksonin Sergej Viktorovich
  • Kireev Valerij Ivanovich
  • Slivkin Sergej Viktorovich
  • Labunets Mikhail Vladimirovich
  • Cherepanov Dmitrij Alekseevich
  • Pikalov Aleksandr Sergeevich
RU2761484C1
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH 2010
  • Tonkonogov Boris Grigor'Evich
  • Klementov Aleksej Sergeevich
  • Saksonin Sergej Viktorovich
  • Osadchuk Evgenij Borisovich
RU2451125C1
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK 2008
  • Tonkonogov Boris Grigor'Evich
  • Androsov Gennadij Pavlovich
  • Saksonin Sergej Viktorovich
  • Osadchuk Evgenij Borisovich
  • Skripachev Ivan Fedorovich
RU2373319C1
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK 2008
  • Tonkonogov Boris Grigor'Evich
  • Saksonin Sergej Viktorovich
  • Skripachev Ivan Fedorovich
  • Bunin Aleksej Ivanovich
RU2373320C1
RAIL LENGTH ASSEMBLY LINE 2008
  • Margolin Aleksandr Iosifovich
  • Vasil'Ev Valerij Evgen'Evich
  • Kireev Valerij Ivanovich
  • Vasil'Ev Vasilij Valer'Evich
  • Skripachev Ivan Fedorovich
  • Bogomolova Raisa Trofimovna
RU2377357C1

RU 2 612 313 C1

Authors

Dates

2017-03-06Published

2015-11-05Filed