FIELD: construction.
SUBSTANCE: device for spacing of sleepers along plot during assembly of railway track links contains a portal trolley moving along the rail track enclosing the assembling bench path. The trolley is equipped with grippers for rails of the path enclosing the bench and with the sleeper position sensors. A movable carriage is mounted on a trolley to move on it along guides. The carriage is equipped with a sleeper density step setter. Regulated stops to interact with lateral edges of concrete sleepers are mounted on the carriage and made vertically rotating to move them along shallow arc when placed between the side faces of the adjacent sleepers. The carriage movement is performed after reset of all the previous commands by the command of the sleeper position sensor for the sleeper link mounted according to sleeper spacing.
EFFECT: increased productivity and improved performance of the device.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE DEVICE FOR REINFORCED CONCRETE PALES INSTALLATION BASED ON EPURE AND "CORD" | 2008 |
|
RU2376411C1 |
EQUIPMENT FOR LAYING TIES ALONG CURVE ON RAIL-LENGTH ASSEMBLY LINE | 0 |
|
SU1789581A1 |
LINE FOR ASSEMBLY OF RAIL LENGHTS ON WOODEN SLEEPERS | 2007 |
|
RU2357036C1 |
MOBILE DEVICE FOR SINGLE REPLACEMENT OF TIES ON STAND IN REPAIR OF RAIL LENGTHS | 2008 |
|
RU2377355C1 |
MOBILE UNIT FOR REINFORCED CONCRETE BEAMS INSTALLATION IN POINT OPERATING GEAR AGAINST DIAGRAM AND ORDINATES | 2007 |
|
RU2355843C1 |
AUTOMATED COMPLEX FOR ASSEMBLING RAIL-SLEEPER GRID OF RAILWAY TRACK | 2021 |
|
RU2761484C1 |
FLOW LINE FOR ASSEMBLY OF RAIL TRACK SWITCH | 2010 |
|
RU2451125C1 |
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
Authors
Dates
2017-03-06—Published
2015-11-05—Filed