FIELD: construction.
SUBSTANCE: winches 3 with ropes are fixed from two sides on the ferries of the river part 2 of the floating bridge. The pontoon crew from the river part of the bridge transfers the steel ropes of the winches to the tug section. The ferry crew fastens the ropes to the bollards of the ferry tug section, after which the ropes are stretched with winches, with which the tug ferry is guided and retained, while the pontoon crew installs screw ties of tension joints.
EFFECT: method allows to simplify the technology of entering a ferry, to reduce the labour costs, the time of entering and securing the tug ferry part in the bridge line, which generally reduces the time for bridging a floating railway bridge across a water barrier.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
METHOD FOR TRANSPORTATION OF AUTHORIZED EQUIPMENT OF FLOATING RAILWAY RIBBON-BRIDGE TO SUSTAIN TRAIN LOADS USING MILITARY-FRONT, MILITARY-REAR (MLZH-VF-VT) ASSEMBLY SCHEME BY WATER | 2017 |
|
RU2667422C2 |
METHOD FOR CREATION OF RIVER PART OF CONTINUOUS FLOATING RAILWAY BRIDGE | 2018 |
|
RU2716629C1 |
GROUND METHOD FOR ASSEMBLING BRIDGE FERRIES OF FLOATING RAILWAY BRIDGE | 2021 |
|
RU2819230C2 |
VEHICLE | 2022 |
|
RU2786744C1 |
METHOD OF BUILDING FLOATING BRIDGE AT FREEZING UP | 2002 |
|
RU2232224C1 |
FLOATING ROAD BRIDGE | 2023 |
|
RU2825359C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
METHOD OF SEPARATE LONG-TERM STORAGE OF SET OF FLOATING RAILROAD BRIDGE NZHM-56 | 2019 |
|
RU2734660C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
Authors
Dates
2017-09-13—Published
2016-04-25—Filed