FIELD: construction.
SUBSTANCE: water encroachment of cutover peats is made as a constructive scheme, including reservoir 1, accumulating water from local runoff, retaining and regulating structures 2 located at the inlet to bypass channel 3, and below main pipeline 4 with closures 5-7. The main pipeline 4 is connected to the ring channels 8, which are connected to each other by means of the water discharge structures 9 with the closures 10-12. Ring channels 8 are made as fenced side walls, made of material in the form of planed boards 13 with slots between them on the one side, and on the other side (the outer side), annular water-retaining dams 14 are made. The dams 14 are poured from the local soil of the peatbog and they serve as a road for moving light motor vehicles on it. Conductive ring channels 8 are made inclined, allowing water to be transferred in a circular manner to fill the encroached area with water. The conducting ring channels 8 are laid with a distance increasing from the center of the cutover peat to the periphery.
EFFECT: design will improve the efficiency of local runoff for encroachment of the whole massif, to resume the marshes to their initial approach, the peat deposit with aquatic vegetation, reduce the energy costs for encroachment the cutover peats and improve the ecological situation, and has the ability to manage the differentiated flooding of each section of the cutover peat.
3 cl, 1 dwg
Authors
Dates
2017-12-27—Published
2017-03-31—Filed