FIELD: mining.
SUBSTANCE: invention relates to the peat digging, specifically to the restoration works of peat bogs, and in particular to the watering of cutover bogs. Watering of cutover bogs is a structural scheme, including reservoir 1, outflow canal 3 and vertical control flap 6 at the beginning of supply canals 4 and 5, made in an earthen channel with shore embankment. Supply channels 4 and 5 are connected to a hydraulic structure constructed as a vertical waterproof fence overlapping each flooded area map from the bottom to the surface. Vertical fence is generally made of inexpensive materials, for example, polyethylene film 12 or capron fabric, and other materials, fixed to the stakes immersed by their lower end into the soil of peat bog.
EFFECT: this makes it possible to reduce the material expenditures on the construction of the hydraulic structure and to provide the possibility of wider use for the watering of the whole massif for the bogs restoration to its initial approximation of the peat deposit with one vegetation, to reduce energy costs and improve the ecological situation.
5 cl, 2 dwg
Authors
Dates
2018-02-14—Published
2017-06-13—Filed