FIELD: electrical equipment; shipbuilding.
SUBSTANCE: use: in the field of electric engineering protection of marine power plants against overload in emergency situations. Method consists in determination of the moment of failure of one or several working GS and disconnection of a part of consumers of electric energy till disconnection of inoperative (inoperative) GS.
EFFECT: technical result is higher reliability of EPS protection with parallel-running generator sets (GS) from overload at one or more GS outage.
2 cl, 1 dwg
Authors
Dates
2019-07-25—Published
2019-01-10—Filed