FIELD: rail vehicles.
SUBSTANCE: invention relates to railway track superstructure, in particular, to storage methods of switch elements. Method of storage consists in the fact that on the site there are bundles with same type of switch elements. Each bundle is two channel plates, on which elements of switch gear are laid. Gaskets are tightened with each other by means of screw ties. Transfer bars and wooden sleepers are also formed into bundles on channel-like pads. On each upper U-rail is installed cargo loop. Bundles are laid in horizontal rows along the perimeter of the platform so that inside structure of bundles with wooden pads or sleepers there arranged are all conversion rails and its smaller elements. Bundles of bars are installed butt to each other without formation of slots. Two rail-gripping devices are installed on the head of each rail. Over the structure reinforced concrete plates are installed and roofing waterproofing material is laid.
EFFECT: enabling faster recovery of switch assembly in case of accident.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATED LONG-TERM STORAGE OF ELEMENTS OF A RAIL-SLEEPER LATTICE OF A RAILWAY TRACK ON REINFORCED CONCRETE SLEEPERS | 2022 |
|
RU2796021C1 |
METHOD FOR EARLY FRAGMENTARY INSTALLATION OF A SINGLE SWITCHOVER ON WOODEN SLEEPERS | 2021 |
|
RU2762047C1 |
METHOD FOR LOADING AND UNLOADING RAILWAY RAILS | 2021 |
|
RU2761888C1 |
METHOD OF SEPARATE LONG-TERM STORAGE OF ELEMENTS OF STEEL SPANS OF RAILWAY BRIDGES FROM DOUBLE-TEE BEAMS | 2019 |
|
RU2734701C1 |
PORTABLE COLLAPSIBLE RAMP | 2022 |
|
RU2795426C1 |
METHOD FOR SEPARATE LONG-TERM STORAGE, LOADING, TRANSPORTATION AND UNLOADING OF ROUND-SECTION WOODEN STRUCTURES FOR RAILWAY FACILITIES | 2019 |
|
RU2740817C1 |
PRODUCTION ASSEMBLY LINE OF TRACK SWITCHES | 2008 |
|
RU2385373C1 |
SWITCH | 2005 |
|
RU2284386C2 |
METHOD OF SEPARATE LONG-TERM STORAGE, LOADING, TRANSPORTATION AND UNLOADING OF RECTANGULAR SECTION WOODEN STRUCTURES FOR RAILWAY FACILITIES | 2019 |
|
RU2741971C1 |
FLOW LINE FOR ASSEMBLY OF POINT SWITCHES OF RAILWAY TRACK | 2008 |
|
RU2373319C1 |
Authors
Dates
2020-06-19—Published
2019-07-01—Filed