FIELD: railway transport; mechanization of maintenance and repair of track. SUBSTANCE: proposed device has frame 6 mounted on two running bogies 1,2 with fitted-on nut runners II provided with probes 13 to determine location of nuts. Bogies 1,2 are installed for displacement along frame by means of differentially-connected double-acting power hydraulic cylinders 9,10. Each running bogie 1,2 is provided with clamps 14 for fastening to track rails. Sum of working areas of hydraulic cylinder rods of both bogies is equal to working area of piston of each hydraulic cylinder. Diameter of rod of hydraulic cylinder of first bogie in direction of running is smaller than diameter of rod of other bogie. EFFECT: provision of continuous process of turning on and off track tie nuts. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ON-OFF TURNING OF NUTS OF INTERMEDIATE RAIL FASTENING | 2001 |
|
RU2213823C2 |
DEVICE FOR SCREWING AND UNSCREWING NUTS (SCREWS) OF INTERMEDIATE RAIL FASTENING OF RAILROAD | 2009 |
|
RU2385377C1 |
TRACK RAILS ENJOINING DEVICE | 1999 |
|
RU2180027C2 |
DEVICE FOR UNSCREWING NUTS OF INTERMEDIATE RAIL FASTENING OF RAILWAY TRACK | 1998 |
|
RU2149234C1 |
MOVING DEVICE FOR ATTACHING LONG JOINTS BY MEANS OF ZHBR-TYPE FASTENINGS DURING REPLACEMENT OF INVENTORY RAILS | 2008 |
|
RU2385376C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
FLOW LINE FOR ASSEMBLING TRACK SKELETON MEMBERS | 2003 |
|
RU2268333C2 |
RAIL TRACK INTERMEDIATE FASTENING NUT TURNING OFF DEVICE | 2000 |
|
RU2207426C2 |
RAIL TRACK INTERMEDIATE FASTENING NUT RUNNER | 1998 |
|
RU2151834C1 |
DEVICE FOR TURNING OFF NUTS OF INTERMEDIATE RAIL FASTENING OF TRACK | 2005 |
|
RU2305148C2 |
Authors
Dates
2000-08-20—Published
1998-07-31—Filed