FIELD: mining technology. SUBSTANCE: according to method, simultaneously with advance of cutting face, second split breakthrough is made. Degree of seam section impact-risk is determined and in case of critical level, stoping operations are discontinued. Section of seam from second split breakthrough to cutting face is left as temporary pillar. Then mining of seam from second split breakthrough is renewed along strike. Blast-holes are drilled from preparatory entry in temporary left pillar. Blasting of explosive charges initiates destruction of temporary pillar by forces of rock pressure, and mined coal is released to hauling entry. After complete extraction of coal from temporary pillar, mining is initiated from third split breakthrough up to second cutting face for temporary pillar. This seam mining procedure remains along entire level. EFFECT: high efficiency. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING SLOPING OR SLANTED SHOCK-HAZARDOUS LAYERS | 2002 |
|
RU2224890C1 |
METHOD OF MINING OF THICK INCLINED OUTBURST-PHONE SEAM | 1998 |
|
RU2143074C1 |
METHOD FOR TREATMENT OF IMPACT-RISKY SEAMS IN DIFFICULT MINING AND GEOLOGICAL CONDITIONS | 1995 |
|
RU2083831C1 |
METHOD FOR EXTRACTING FLAT-LYING AND INCLINED IMPACT-HAZARDOUS BEDS | 2005 |
|
RU2296859C1 |
METHOD FOR DEVELOPING AREA OF FLAT AND SLOPE SEAM LIABLE TO ROCK-BUMPS | 2011 |
|
RU2459079C1 |
METHOD FOR WORKING PROTECTION PILLARS IN GROUP OF HEADINGS IN THICK BUMP-RISKY SEAMS | 1996 |
|
RU2103508C1 |
METHOD OF WORKING NEAR-SHAFT PILLARS IN THICK GENTLY-SLOPING DEPOSITS | 0 |
|
SU981609A1 |
PROCESS OF WORKING OF COAL SEAMS | 1998 |
|
RU2164293C2 |
METHOD FOR BURYING RADIOACTIVE AND OTHER WASTES | 1994 |
|
RU2068206C1 |
METHOD OF MINE WORKING PROTECTION WITH HELP OF ROCK MASS YIELDING SYSTEM | 2002 |
|
RU2212543C1 |
Authors
Dates
1997-07-10—Published
1995-09-26—Filed