FIELD: oil production industry. SUBSTANCE: this is used for investigation of oil wells, oil beds and their sections. Method implies analysis of dependence between accumulated volume of produced oil and accumulated volume of produced liquid and intensity of product flooding. Additionally determined is volume of oil produced in waterless period of operation. Volume of extracted oil reserve is calculated by following formula: V∞ = Vo+[(V -Vo)1-α-(Vl-Vo)1-α]1/(1-α), where V∞ - volume of extracted oil reserve, t; Vo - volume of oil extracted in waterless period of operation, t; V and Vl - accumulated volumes of produced oil and liquid respectively, t; α - parameter which characterizes intensity of product flooding which is determined from following formula: , where B - product flooding in fractions of one. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SELECTING WELLS FOR SHUTTING-IN | 1995 |
|
RU2096607C1 |
METHOD FOR CONTROL OF DEVELOPMENT OF OIL POOLS WITH THE HELP OF MAPS OF RESIDUAL OIL-SATURATED STRATA | 1997 |
|
RU2122107C1 |
METHOD FOR ISOLATION OF FORMATION | 1994 |
|
RU2069745C1 |
METHOD FOR FINAL DEVELOPMENT OF OIL DEPOSIT AT CONCLUDING STAGE OF OPERATION | 1996 |
|
RU2116436C1 |
METHOD FOR AFTER-EXPLOITATION OIL DEPOSIT | 1994 |
|
RU2072033C1 |
METHOD OF CONTROL OVER DEVELOPMENT OF OIL DEPOSIT WITH FORMATIONS NONUNIFORM IN BEDDING | 1998 |
|
RU2148169C1 |
METHOD OF DEVELOPING OIL DEPOSIT | 1997 |
|
RU2135753C1 |
METHOD FOR DEVELOPING MULTIPLE-BED OIL DEPOSIT BY SYSTEM OF HORIZONTAL WELLS | 1995 |
|
RU2093669C1 |
METHOD FOR EXPLOITATION OF OIL DEPOSIT OF COMPLEX STRUCTURE IN LATE STAGE | 1993 |
|
RU2077663C1 |
METHOD FOR DEVELOPMENT OF OIL FIELD AT FINAL STAGE WITH THE HELP OF FORCED WITHDRAWAL | 1996 |
|
RU2120543C1 |
Authors
Dates
1997-10-10—Published
1995-07-21—Filed