FIELD: construction.
SUBSTANCE: device includes frame installed on bogie wheels of two carriers with wheels for movement on rails. Carriers are equipped with main units of nut setters for processing of rail fastenings on one rail-and-sleeper assembly and additional units in order to make it possible to process rail fastenings on two adjacent sleepers at one and the same time, which sound the location of nuts with members and clamps of rails of the railroad. Units of nut setters are equipped with adjustment mechanism, and adjustment mechanism is made in the form of power cylinder. On device frame there installed is gear rack, and each carrier is equipped in upper part with drive gear wheel for interaction with gear rack and a pair of hold-down rollers for interaction with frame.
EFFECT: increasing process efficiency of intermediate rail fastenings of railroad.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL TRACK INTERMEDIATE FASTENINGS NUT RUNNER | 1998 |
|
RU2154710C2 |
DEVICE FOR ON-OFF TURNING OF NUTS OF INTERMEDIATE RAIL FASTENING | 2001 |
|
RU2213823C2 |
MOVING DEVICE FOR ATTACHING LONG JOINTS BY MEANS OF ZHBR-TYPE FASTENINGS DURING REPLACEMENT OF INVENTORY RAILS | 2008 |
|
RU2385376C1 |
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
METHOD TO ASSEMBLE RAIL LENGTHS IN UNPADDED TYPE OF JOINTS | 2010 |
|
RU2437979C1 |
DEVICE FOR TURNING OFF NUTS OF INTERMEDIATE RAIL FASTENING OF TRACK | 2005 |
|
RU2305148C2 |
SCREWING DEVICE FOR RAIL CONNECTION OF ZHBR-65SH | 2008 |
|
RU2376412C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
DEVICE FOR BALLAST REMOVAL FROM UNDER RAIL ROAD BASE | 2005 |
|
RU2293812C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
Authors
Dates
2010-03-27—Published
2009-01-11—Filed