FIELD: mining, methods of mining of coal seams. SUBSTANCE: method includes driving of development workings and mounting in coal seam of stoping equipment; drilling of holes at seam roof uniformly over entire length of breakage face to side of pillar anticipated extraction; location in each hole of supporting beam whose caving end in face space is propped to roof by hydraulic prop provided with guard. Coal is mined by stripper under supporting beams. In so doing, provided in each cycle of stoping operations is deepening of holes and advancing in them of beams. Periodically, as breakage face advances, direction of hole drilling is controlled by position of supporting beam caving part in face space, and correction is made, if need be. EFFECT: higher efficiency of mining due to use of coal mass as bearing support of breakage face space. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF FLAT COAL SEAM | 2000 |
|
RU2187644C2 |
METHOD OF MINING OF THICK FLAT COAL BED | 1999 |
|
RU2168629C1 |
METHOD OF MINING OF THICK STEEP COAL SEAMS | 2002 |
|
RU2212536C1 |
METHOD OF MINING OF STEEP COAL SEAM | 2001 |
|
RU2208161C1 |
LINING FOR SUPPORTING A BREAKAGE FACE OF A STEEPLY INCLINED COAL SEAM | 2002 |
|
RU2231646C1 |
SUPPORT UNIT FOR SUPPORTING BREAKAGE FACE OF STEEPLY INCLINED HIGH COAL BED | 2003 |
|
RU2235208C1 |
SUPPORT OF BREAKIAGE FACE OF STEEP COAL SEAM | 2001 |
|
RU2206752C1 |
PROCESS OF EXPLOITATION OF GENTLY DIPPING SEAM | 1999 |
|
RU2151870C1 |
SUPPORT OF BREAKAGE FACE OF THICK STEEP COAL SEAM | 2002 |
|
RU2212541C1 |
METHOD FOR DEVELOPMENT OF THICK GENTLY DIPPING COAL SEAM | 1998 |
|
RU2138640C1 |
Authors
Dates
2002-08-10—Published
2000-06-20—Filed