FIELD: arrangements for testing electric properties.
SUBSTANCE: method comprises disconnecting the transformer from the power source and rectifier, supplying testing pulse to the phase windings of the transformer from a generator of standard testing voltage pulses of a given amplitude, and measuring current pulse at the shunt connected with the device for measuring current. The shunt is alternately connected between the beginnings of the phase windings of high voltage arranged at the end rods and the core.
EFFECT: reduced labor consumptions and expanded functional capabilities.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR DIAGNOSTICS OF INTERTURN SHORT-CIRCUITS IN POWER TRANSFORMER WINDINGS | 2016 |
|
RU2642521C2 |
METHOD FOR CONTROL OF DEFORMATION OF WINDINGS OF STEP-DOWN THREE-PHASE DOUBLE WINDING THREE-LEGGED POWER TRANSFORMER UNDER OPERATIONAL CURRENTS AND VOLTAGES | 2011 |
|
RU2478977C1 |
METHOD OF ISOLATION MONITORING STATE RESULTS OF ANCHOR WINDING OF DC MACHINES | 2017 |
|
RU2650428C1 |
DEVICE FOR DIAGNOSING STATE OF INSULATION POWER CIRCUITS | 2015 |
|
RU2590221C1 |
METHOD FOR CONTROLLING ELECTRO-TECHNICAL STATE OF ELECTRIC MACHINES | 2004 |
|
RU2274869C2 |
THREE-PHASE-MULTIPHASE TRANSFORMER CONVERTER OF NUMBER OF PHASES | 2023 |
|
RU2823770C1 |
METHOD FOR MONITORING INSULATION STATE OF ARMATURE WINDING OF DC MACHINES | 2019 |
|
RU2723926C1 |
METHOD OF CHECKING NON-OCCUPANCY OF TRACK SECTIONS | 2003 |
|
RU2256577C2 |
MODE OF DIAGNOSTICS OD ELECTRICAL ENGINES OF ALTERNATING CURRENT AND OF MECHANICAL ARRANGEMENTS INVOLVED WITH THEM | 2005 |
|
RU2300116C2 |
INDUCTION ELECTRIC MOTOR | 1992 |
|
RU2088042C1 |
Authors
Dates
2005-04-20—Published
2003-12-29—Filed