FIELD: pipeline transport.
SUBSTANCE: method comprises setting the pipe into the shell concentrically with a spaced relation, setting face plugs, filling the ring space between the pipe and shell with a foamed heat insulated material, and solidifying. Before setting the pipe into the shell, its outer surface is cleaned and heated simultaneously. Before filling the ring space between the pipe and shell, the pipe and shell are inclined together with the transporting conveyer with the use of one of its supports that is adjustable in height. The ring space between the pipe and shell is filled from the top end. All of the operations, including cleaning and setting the pipe into the shell, are performed with the use of transporting roller conveyer, conveyers, and mechanical rearranging devices.
EFFECT: enhanced quality and reduced cost.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR APPLICATION OF BALLAST COATING ON PIPE SURFACE | 2007 |
|
RU2345267C2 |
PIPELINE HEAT INSULATING FLOW LINE | 2002 |
|
RU2223440C1 |
METHOD OF PRODUCING HEAT-INSULATING PIPE | 2003 |
|
RU2273787C2 |
PIPELINE COMPLEX HEAT INSULATION AND BALLASTING DEVICE | 2023 |
|
RU2823680C1 |
METHOD OF MANUFACTURING INSULATED PIPES AND SHAPED OBJECTS FOR PIPELINES | 2013 |
|
RU2622776C2 |
HEAT INSULATED PIPE AND PIPELINE SECTION WITH SEALING SECTION AT OUTER SURFACE AND AT THE ENDS | 2014 |
|
RU2576078C1 |
METHOD FOR HEAT INSULATION OF PIPE FOR AIR, GROUND AND UNDERGROUND INSTALLATION | 2007 |
|
RU2386076C2 |
COMPLETE SET OF HEAT-HYDRO-INSULATED PIPES AND PROCEDURE FOR FABRICATING PRELIMINARY HEAT-HYDRO-INSULATED PIPE | 2008 |
|
RU2389932C2 |
METHOD FOR HEAT INSULATION OF TUBES FOR UNDERGROUND LAYING | 2001 |
|
RU2200897C1 |
COMPLETE SET OF HEAT-HYDRO-INSULATED PIPES AND PROCEDURE FOR FABRICATING PRELIMINARY HEAT-HYDRO-INSULATED PIPE | 2008 |
|
RU2389933C2 |
Authors
Dates
2005-08-10—Published
2003-10-07—Filed