FIELD: railroad equipment, particularly fixing or removing detachable fastening means or accessories thereof, pre-assembling track components by detachable fastening means.
SUBSTANCE: line comprises parallel direct and reverse racks for lattice component material receiving arranged under crane and enclosing guiding racks to move independent units of technological equipment in technological component assemblage order. Swinging devices, which rotate through 180°, are connected to rack ends and include rack section and guiding means enclosing it.
EFFECT: provision of unit displacement along closed path without cranes used for unit movement between direct and reverse racks and increased line productivity.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
LINE FOR REPAIR OF RAILWAY TRACK LENGTHS WITH REINFORCED CONCRETE TIES | 2007 |
|
RU2361032C1 |
LINE FOR ASSEMBLY OF RAIL LENGHTS ON WOODEN SLEEPERS | 2007 |
|
RU2357036C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
FLOW-LINE FOR ASSEMBLING SECTIONS OF RAIL-AND-SLEEPER UNITS | 1997 |
|
RU2115782C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
DEVICE FOR SPACING OF SLEEPERS ACCORDING TO SLEEPER DENSITY DURING ASSEMBLY OF TRACK LINKS | 2015 |
|
RU2612313C1 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
Authors
Dates
2007-02-20—Published
2005-10-12—Filed