FIELD: construction, road engineering.
SUBSTANCE: invention is related to method of manufacturing of reinforced concrete sleeper or point switch bar with elastic base and may be used in railway transport. Method consists in the fact that rubber plates or rubber tape are glued onto support surface of sleeper or bar with polyurethane glue at the pressure of cantledge of 0.5- 1.0 kPa and maintenance time of 12-18 hours.
EFFECT: lower labour intensiveness and simplified process of standard reinforced concrete sleepers and point switch reinforced concrete bars equipping with elastic shock-absorbing elements.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
THREADLESS TRACK RAIL BRACE WITH REINFORCED CONCRETE SLAB TRACK | 2011 |
|
RU2509185C2 |
STRUCTURE OF TRAM TRACK WITH UPPER COATING OF LARGE-SIZE PLATES | 2024 |
|
RU2834496C1 |
STRUCTURE OF TRAM TRACK WITH TOP COATING OF ASPHALT CONCRETE | 2024 |
|
RU2834498C1 |
STRUCTURE OF SINGLE-TRACK SECTION OF TRAM TRACK WITH PLATE | 2024 |
|
RU2834327C1 |
REINFORCED CONCRETE SLEEPER | 2005 |
|
RU2293810C1 |
DESIGN OF SINGLE-TRACK SECTION OF TRAMWAY TRACK | 2024 |
|
RU2834347C1 |
STRUCTURE OF TRAMWAY WITH STOPPING PLATFORM | 2024 |
|
RU2834497C1 |
RAILWAY CROSSING AND METHOD OF MANUFACTURE OF RUBBER-REINFORCED CONCRETE PLATES FOR CROSSING | 2005 |
|
RU2295000C1 |
RAILWAY CROSSING DECK | 2022 |
|
RU2785809C1 |
METHOD FOR SMOOTH TAPPING OF RAILWAY TRACK WIDTH AND REINFORCED CONCRETE RAIL SEAT FOR ITS REALISATION (VERSIONS) | 2007 |
|
RU2373318C2 |
Authors
Dates
2010-02-27—Published
2008-12-18—Filed