FIELD: radio engineering, communication.
SUBSTANCE: method is realised by choosing between methods of setting up a Stream Control Transmission Protocol connection with a radio home base station Home Node B and with common radio station Node B.
EFFECT: enabling efficient setup of a Stream Control Transmission Protocol connection while avoiding unnecessary increase in the upper layer node load associated with processing.
4 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE TO INCREASE GATEWAY STABILITY IN FEMTOCELL SYSTEM IN LTE MODE | 2013 |
|
RU2605000C2 |
MOBILE COMMUNICATION SYSTEM, BASE STATION, TOP-LEVEL DEVICE, GATEWAY DEVICE, COMMUNICATION METHOD AND PROGRAMME | 2010 |
|
RU2518437C2 |
MOBILE COMMUNICATION SYSTEM, BASE STATION, TOP-LEVEL DEVICE, GATEWAY DEVICE, COMMUNICATION METHOD AND PROGRAMME | 2014 |
|
RU2572564C2 |
MOBILE COMMUNICATION SYSTEM, BASE STATION, TOP-LEVEL DEVICE, GATEWAY DEVICE, COMMUNICATION METHOD AND PROGRAM | 2017 |
|
RU2671952C1 |
MOBILE COMMUNICATION SYSTEM, BASE STATION, HIGHER ORDER DEVICE, GATEWAY DEVICE, COMMUNICATION METHOD AND PROGRAM | 2015 |
|
RU2640034C2 |
MOBILE COMMUNICATION SYSTEM | 2013 |
|
RU2524694C1 |
MOBILE COMMUNICATION SYSTEM | 2010 |
|
RU2491776C2 |
MOBILE COMMUNICATION SYSTEM | 2010 |
|
RU2498532C2 |
MOBILE COMMUNICATION SYSTEM | 2010 |
|
RU2515499C2 |
LOCAL DISCHARGE AND SMALL CELLS ARCHITECTURE (SCA) | 2015 |
|
RU2630418C1 |
Authors
Dates
2013-07-27—Published
2009-02-03—Filed