FIELD: construction.
SUBSTANCE: method of hydrothermal insulation of pipes is carried out in factory conditions by foamed polymeric materials with a mineral filler in a metal split mould. A pipe is installed in the split mould. The foam polymeric composition is poured on the top of the pipe so that the reaction mixture first covers the pipe surface and then flows down to the mould bottom and foams after closing the mould. The pipe in the mould is kept until the foam polymeric composition is fully cured, and unloaded from the mould.
EFFECT: improving the hydrothermal insulation quality occurs as a result of the porosity reduction and the density increase of the inner layer of the insulation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF THERMOHYDROINSULATION OF PIPES ON BASE OF FOAM POLYMER COMPOSITIONS | 1997 |
|
RU2115059C1 |
HEAT PIPE LINE | 1997 |
|
RU2115058C1 |
HEAT AND WATER INSULATION BASED ON POLYMER-MINERAL FOAM COMPOSITION | 1997 |
|
RU2121466C1 |
PIPE HEAT AND HYDRAULIC INSULATION METHOD | 0 |
|
SU625092A1 |
METHOD OF HEAT AND HYDRAULIC INSULATION OF PIPES ON BASE OF FOAM PLASTICS AND LINE FOR REALIZATION OF THIS METHOD | 1996 |
|
RU2140039C1 |
METHOD OF PIPE HEAT-AND-WATER-PROOFING | 2014 |
|
RU2584386C2 |
HEAT HYDRO INSULATION PIPELINE PRODUCTS FOR HIGH-TEMPERATURE THERMAL NETWORKS, HEAT AND TECHNOLOGICAL PIPELINES AND THE METHOD OF ITS MANUFACTURE | 2017 |
|
RU2669218C1 |
SET OF FILLING FLANGES FOR MANUFACTURE OF HEAT INSULATED PIPES WITH POLYURETHANE FOAM COATING (EMBODIMENTS) | 2017 |
|
RU2637595C1 |
METHOD FOR APPLICATION OF PIPELINE HEAT INSULATION | 2010 |
|
RU2447353C2 |
COMBINED PIPE | 1999 |
|
RU2156910C1 |
Authors
Dates
2018-04-18—Published
2016-07-04—Filed