FIELD: metallurgy.
SUBSTANCE: method includes mechanical removal of an oxidated layer off the surface of an inside cartridge from the side of a blow channel and muzzle part of the tuyer with thermal treated aluminium containing gas thermal coat. Then an aluminium containing coating is applied on the outer surface of the muzzle part of the tuyer. Then the tuyer is installed into a blast furnace in not earlier than twenty four hours after coating application.
EFFECT: invention reduces heat losses through a tuyer and increases its burn out resistance.
2 cl, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PREPARE AIR TUYERE OF BLAST FURNACE FOR OPERATION AND ITS INSTALLATION | 2012 |
|
RU2491351C1 |
METHOD FOR LINING AIR TUYERES OF BLAST FURNACE | 2020 |
|
RU2752604C1 |
BLAST TUYERE OF BLAST FURNACE AND METHOD FOR APPLYING OF PROTECTIVE COATING ONTO BLAST TUYERE OF BLAST FURNACE | 2002 |
|
RU2235789C2 |
PREPARATION METHOD OF AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2011 |
|
RU2465333C2 |
METHOD FOR PREPARING AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2004 |
|
RU2260058C1 |
METHOD OF PREPARATION OF BLAST FURNACE TUYERE FOR OPERATION | 2001 |
|
RU2215043C2 |
BLAST TUYERE FOR BLAST FURNACES AND METHOD OF MANUFACTURE OF SUCH TUYERE | 2002 |
|
RU2233338C1 |
BLAST FURNACE TUYERE PREPARATION METHOD | 2008 |
|
RU2387716C2 |
METHOD OF PREPARATION FOR OPERATION OF AIR TUYERE OF BLAST FURNACE | 2019 |
|
RU2709178C1 |
METHOD OF PREPARATION OF BLAST FURNACE AIR TUYERE FOR OPERATION | 2006 |
|
RU2325444C2 |
Authors
Dates
2008-06-27—Published
2006-05-06—Filed