FIELD: metallurgy.
SUBSTANCE: cleaning of outer sleeve and blasting part by the metal shot, spraying of the aluminium-containing gas-thermal coating on them, installation of a heat-insulating insert in the inner sleeve with an air gap therebetween and heat treatment. Heat treatment of the tuyere with the coating is carried out before the insert installation. After the insert is installed, it is pressed by ring on the flange side, which is welded to the inner sleeve.
EFFECT: extension of insert service life.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2303636C2 |
METHOD OF PREPARATION OF BLAST FURNACE TUYERE FOR OPERATION | 2001 |
|
RU2215043C2 |
METHOD FOR PREPARING AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2004 |
|
RU2260058C1 |
PREPARATION METHOD OF AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2011 |
|
RU2465333C2 |
METHOD TO PREPARE AIR TUYERE OF BLAST FURNACE FOR OPERATION AND ITS INSTALLATION | 2012 |
|
RU2491351C1 |
BLAST TUYERE OF BLAST FURNACE AND METHOD FOR APPLYING OF PROTECTIVE COATING ONTO BLAST TUYERE OF BLAST FURNACE | 2002 |
|
RU2235789C2 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2308491C2 |
METHOD FOR PREPARING BLAST FURNACE TUYERE FOR OPERATION | 1998 |
|
RU2147614C1 |
METHOD FOR INSTALLATION OF HEAT-INSULATING INSERT INTO BLOWING CHANNEL OF AIR TUYERE OF BLAST FURNACE | 2018 |
|
RU2686750C1 |
METHOD OF PREPARATION FOR OPERATION OF AIR TUYERE OF BLAST FURNACE | 2019 |
|
RU2709178C1 |
Authors
Dates
2017-11-13—Published
2016-07-14—Filed