FIELD: ice engineering.
SUBSTANCE: invention can be used to create ice crossings or ice load-carrying platforms for storing cargo. A method for creating an ice crossing involves forming a trench in the ice cover with a depth less than the thickness of the ice. The resulting ice surface is exposed to low temperatures (t<0°C) during the time required for an ice build-up to form under the ice at the excavation site. Then, through holes are made in the ice surface formed in this place. After filling the excavated trench with water, reinforcing elements are immersed in it and it is re-exposed to low temperatures for the time required for the infused water to completely freeze.
EFFECT: improved performance.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ICE CROSSING FORMATION | 2023 |
|
RU2815794C1 |
METHOD OF CREATING ICE CROSSING | 2023 |
|
RU2819053C1 |
METHOD FOR ICE CROSSING FORMATION | 2022 |
|
RU2795849C1 |
METHOD FOR ICE CROSSING CREATION | 2022 |
|
RU2793628C1 |
METHOD OF FORMATION OF ICE LOAD-CARRYING PLATFORM | 1998 |
|
RU2144967C1 |
METHOD FOR MANUFACTURING LOAD-CARRYING ICE PLATFORM | 2000 |
|
RU2171335C1 |
METHOD OF FORMING ICE CARGO-CARRYING PLATFORM | 2000 |
|
RU2198355C2 |
METHOD TO INCREASE BEARING CAPACITY OF ICE COVER | 2014 |
|
RU2565623C1 |
METHOD FOR BUILDING ICE CROSSING | 2013 |
|
RU2554376C2 |
METHOD TO INCREASE BEARING CAPACITY OF ICE COVER | 2018 |
|
RU2695578C1 |
Authors
Dates
2024-04-26—Published
2023-08-10—Filed