FIELD: peak-load hot-water boiler plants; heat-power engineering. SUBSTANCE: method of operation of peak-load hot-water boiler plant consists in heating the heating-system water in hot-water boiler and directing it to consumers; leakage of heating-system water is compensated for by make-up water which is prepared in vacuum deaerator to which starting water and heating agent are fed; then, deaerated make-up water is directed to heating-system pipe line. Heating agent and starting water are heated by waste gases of hot-water boiler before supply to vacuum aerator; heating agent is heated first in way of flow of waste gases. EFFECT: enhanced economical efficiency of peak-load hot-water boiler plant. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2189525C2 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184310C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184309C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184315C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184311C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184313C1 |
BOILER AGGREGATE OPERATION METHOD | 2002 |
|
RU2209376C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184314C1 |
BOILER AGGREGATE | 2002 |
|
RU2209375C1 |
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE | 1998 |
|
RU2137985C1 |
Authors
Dates
2002-06-27—Published
2000-10-13—Filed