FIELD: heat and power engineering, namely boiler aggregates. SUBSTANCE: method comprises steps of heating mains water in boiler and supplying it to users; compensating leakage of mains water in heating circuit with use of making up water prepared in vacuum deaerator; in order to realize it supplying initial water and heating agent to deaerator; guiding dearated making up water into mains pipeline. Novelty is successive heating of heating agent and initial water before supplying them to vacuum deaerator by means of heat of exhaust gases of boiler. EFFECT: enhanced effectiveness of operation of boiler aggregate. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILER AGGREGATE | 2002 |
|
RU2209375C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184310C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184312C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2189525C2 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184309C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184315C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184311C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184314C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184313C1 |
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE | 1998 |
|
RU2137985C1 |
Authors
Dates
2003-07-27—Published
2002-02-15—Filed