PEAK-LOAD HOT-WATER BOILER PLANT Russian patent published in 2002 - IPC

Abstract RU 2184314 C1

FIELD: peak-load hot-water plants; heat-power engineering. SUBSTANCE: peak-load hot-water boiler plant includes hot-water boiler connected to heating- system pipe line, make-up water vacuum deaerator with starting water pipe line and deaerator make-up water pipe line connected to heating system pipe line. Deaerator make-up water pipe line is connected to heat-system pipe line through first (In way of flow of waste gases) surface heat exchanger located in gas duct and starting water pipe line is connected to vacuum deaerator through second (in way of flow of waste gases) surface heat exchanger located in the same gas duct. EFFECT: enhanced economical efficiency of peak-load hot-water boiler plant. 1 dwg

Similar patents RU2184314C1

Title Year Author Number
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184309C1
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184315C1
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184311C1
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184313C1
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184310C1
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2189525C2
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184312C1
BOILER AGGREGATE 2002
  • Sharapov V.I.
  • Levushkina Ju.V.
RU2209375C1
BOILER AGGREGATE OPERATION METHOD 2002
  • Sharapov V.I.
  • Levushkina Ju.V.
RU2209376C1
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE 1998
  • Sharapov V.I.
  • Orlov M.E.
RU2137985C1

RU 2 184 314 C1

Authors

Sharapov V.I.

Orlov M.E.

Rotov P.V.

Dates

2002-06-27Published

2000-10-31Filed