FIELD: heat and power engineering, possibly boiler aggregates. SUBSTANCE: boiler aggregate includes boiler, vacuum water deaerator with pipelines for initial water, for heating agent and for deaerated water. Novelty is arrangement of surface preheater of heating agent of vacuum deaerator and contact type preheater of initial water of vacuum deaerator in gas duct of boiler according to motion direction of combustion products. EFFECT: enhanced effectiveness of boiler aggregate. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILER AGGREGATE OPERATION METHOD | 2002 |
|
RU2209376C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184309C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184315C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184311C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184314C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184310C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184312C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2189525C2 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184313C1 |
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE | 1998 |
|
RU2137985C1 |
Authors
Dates
2003-07-27—Published
2002-02-15—Filed