FIELD: peak-load hot-water boilers; heat-power engineering. SUBSTANCE: heating-system water is heated in hot-water boiler and is directed to consumers; leakage of heating-system water is compensated for by make-up water is prepared in vacuum deaerator. Starting water is fed deaerator; make-up water before supply to heating-system pipe line and starting water before supply to vacuum deaerator are heated in succession by waste gases of hot-water boiler. EFFECT: enhanced economical efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184310C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184312C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2189525C2 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184309C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184315C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184314C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184311C1 |
BOILER AGGREGATE OPERATION METHOD | 2002 |
|
RU2209376C1 |
BOILER AGGREGATE | 2002 |
|
RU2209375C1 |
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE | 1998 |
|
RU2137985C1 |
Authors
Dates
2002-06-27—Published
2000-10-31—Filed