FIELD: metallurgy.
SUBSTANCE: invention can be used in preparing to operation of air tuyeres of blast furnaces. To achieve technical result in preparation of blast furnace air tuyere for operation, which involves application of aluminium-containing gas-thermal coating on working surface of tuyere, thermal treatment of tuyere and applying layer of boron-containing coating, the plaster is applied on aluminic coating, and after heat treatment of plaster is applied on welded seams. Boron-containing coating used is abrasion-resistant refractory coating on basis of boron carbide or high temperature boron nitride-based coating.
EFFECT: higher resistance of tuyere in operation.
3 cl, 4 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PREPARE AIR TUYERE OF BLAST FURNACE FOR OPERATION AND ITS INSTALLATION | 2012 |
|
RU2491351C1 |
PREPARATION METHOD OF AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2011 |
|
RU2465333C2 |
METHOD OF PREPARING TO OPERATION AND INSTALLATION OF BLAST FURNACE AIR TUYERE | 2006 |
|
RU2327742C2 |
METHOD OF PREPARATION OF BLAST FURNACE AIR TUYERE FOR OPERATION | 2006 |
|
RU2325444C2 |
BLAST FURNACE TUYERE PREPARATION METHOD | 2008 |
|
RU2387716C2 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2303636C2 |
METHOD FOR PREPARING BLAST FURNACE AIR TUYERE FOR OPERATION | 2016 |
|
RU2635489C1 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2308491C2 |
BLAST TUYERE OF BLAST FURNACE AND METHOD FOR APPLYING OF PROTECTIVE COATING ONTO BLAST TUYERE OF BLAST FURNACE | 2002 |
|
RU2235789C2 |
METHOD OF PREPARING TUYERE OF BLAST FURNACE FOR OPERATION | 1998 |
|
RU2132391C1 |
Authors
Dates
2016-09-10—Published
2015-02-03—Filed